Përshkrimi
Mineral Reserves: 2008 core drilling and testing (on just 60 of the 1,100 acres) proved 30-60 million tons of high-grade calcium carbonate. Other reports show high-grade calcium carbonate throughout remainder of the property. Geological reports available.
Transportation: Railroad access within 16-18 miles. Rail company may extend existing line to site. Roads: Paved, county-maintained two lane road runs from Blythe to the entrance of the property. Paved roads up to quarry then good gravel roads throughout site. Water: By well (four miles from Colorado River)
ID e Pronës: 20018
Çmimi: 100€ / sq. ft.
Sipërfaqja e pronës: 29,000 m2
Sipërfaqja e parcelës: 35,000 ac
Dhoma: 3
Dhoma të gjumit: 2
Banjo: 5
ID e pronës: 147
Bodrumi: cement
Viti i ndërtimit: 2000
Garazhda: 2 cars
Detaje të brendshme
Ashensor
Dhomë argëtimi
Kuzhina
Lavanderi
Lavatriçe dhe tharëse
Palestër
Xhakuzi
Detaje të jashtme
Fushë basketbolli
Garazha
Oborr
Pishinë
Qasje për karrige me rrota
Instalimet
Detektorë tymi
Kondicionimi
Ngrohja
Rryma
Ujë
Ventilim
WiFi
Sht
20
Qer
Die
21
Qer
Hën
22
Qer
Mar
23
Qer
Mër
24
Qer
Enj
25
Qer
Pre
26
Qer
Sht
27
Qer
Die
28
Qer
Hën
29
Qer


